"The gym has made this project a success,"
         -Chris Brzozowski, Project Manager, Weaver and Jacobs Constructors
Project: Bremond Independent School District Gymnasium
Owner: Bremond ISD
Location: Bremond, TX

Installation Date: 2011
Product: SignaFlex 6.5mm Cherry/Red

In 2010, Bremond Independent School District initiated renovations and new additions to its existing facility in Bremond, Texas. Included in that new construction was a 6,700sqft gymnasium, for which SignaSports™ proposed its SignaFlex 6.5mm resilient athletic surface. Collaborating with the architect, PBK Architects, Signature Sports leveraged its experience to assist in optimizing the final court layout and color scheme that provided the school district with a new athletic surface that transformed the space and made the overall project a success.

Prior to arriving on site, discussion between Signature Sports and PBK Architects led to a few design changes. First, the overall color scheme was altered resulting in a wider border and more color, which provided a more competitive aesthetic. Second, based on Signature’s suggestion, the increase in color warranted the use of SignaFlex 6.5mm Red rather than a red, polyurethane-based paint. The benefit would far outweigh the marginal increase in cost by decreasing the installation time and cost and annual maintenance. Third, anticipating the indiscernible maze of lines and colors that 3 additional badminton courts would have created, Signature proposed scaling down the original game court layout to include only a main basketball court and 3 volleyball courts.

With the layout finalized, moisture tests were taken. Unfortunately, the Calcium Chloride tests showed levels exceeding 5lbs per 1,000sqft, which forced the school district and the contractor to postpone the installation. Fortunately, approximately 4-6 weeks after dehumidifying the gymnasium, moisture levels decreased and Signature was able to coordinate an installation date and crew to complete the job. Once on site, Signature’s crew substantially completed the installation in 6 days, even accommodating a last minute change to the overall game line layout. With an experienced company and crew, such consultations and accommodations are possible. For this project, they were essential and Signature Sports provided the Bremond Independent School District and the school the competitive gymnasium facility they had envisioned.

The SignaFlex Advantage:
Real wood appearance at affordable cost
Excellent shock absorption reducing injury and stress
Low maintenance
Multipurpose surface ideal for educational and worship facilities